Preparation
within 3–5 working days
This style is prepared after your order and then checked before international transit.
Processing time: this style is usually prepared within 3–5 working days before international shipping.
Included: Dress + Shawl + Necklace includes one dress in the selected size, one shawl and one necklace. Dress Only includes the dress without shawl or necklace. Shawl Only and Necklace Only each include just the named accessory in One Size. Headwear, gloves, shoes, petticoat and other styling pieces are not included.
| Size | Length | Total sleeve length | Sleeve opening | Short sleeve length | Short sleeve opening | Shoulder | Bust range | Waist range |
|---|---|---|---|---|---|---|---|---|
| S | 130 | 61 | 18 | 21 | 26 | 36 | 86–98 | 71–85 |
| M | 132 | 62 | 19 | 21.4 | 27 | 37 | 90–102 | 75–89 |
| L | 134 | 63 | 20 | 22 | 28 | 38 | 94–106 | 79–93 |
| XL | 136 | 64 | 21 | 22.5 | 29 | 39 | 98–110 | 83–97 |
Garment measurements in cm, for the dress only. Allow about 4cm between your body and the garment, following the published wearing-room guidance. Bust and waist ranges are the published garment ranges; no additional stretch allowance is inferred. Shawl and necklace are One Size; their exact dimensions are not published. Dress-containing choices use S–XL, not One Size.
Follow the garment care label. Handle prints, lace, ribbons and fastenings gently; avoid bleach, high heat and snagging. Where care instructions are absent or unclear, seek specialist garment care. Keep jewelry dry and store it separately.
Description
Sacred Coronation brings cathedral and cross motifs to a Regency-inspired empire-waist dress with a square neckline, puff sleeves and lace hem. Choose the full dress, shawl and necklace coordinate or the individual pieces in this same listing.
Order logistics
Total waiting time is preparation time plus tracked international shipping.
within 3–5 working days
This style is prepared after your order and then checked before international transit.
Before dispatch
We check the selected option, packaging, and tracking details before the parcel leaves.
Usually 5-12 business days
Transit time starts after dispatch and depends on destination, customs, and local delivery.
Shipping estimates are business-day ranges after dispatch. Holidays, customs checks, remote areas, strikes, and local courier delays may add extra time.
Coordinate ideas
Accessories and foundations selected to help you build a finished Lolita coordinate.
First Loliroom Order
Use code WELCOME4. Authentic Lolita brands, quality checked, with tracked shipping after dispatch.